Email cnzhaohang@163.com WEchat +8615058371692  skype +86 15058371692

USD
Home>Explosion-proof electrical apparatus>Steam curing equipment for cement prefabricated parts Bridge automatic electric heating steam curing machine
Steam curing equipment for cement prefabricated parts Bridge automatic electric heating steam curing machine

Steam curing equipment for cement prefabricated parts Bridge automatic electric heating steam curing machine Item NO.: 1945426

Write a Review
US$ 1200.00
Quantity

Copy and share this link on social network or send it to your friends

Copy
  • Steam curing equipment for cement prefabricated parts Bridge automatic electric heating steam curing machine
Product Name Steam curing equipment for cement prefabricated parts Bridge automatic electric heating steam curing machine
Item NO. 1945426
Weight 10 kg = 22.0462 lb = 352.7396 oz
Category Explosion-proof electrical apparatus
Creation Time 2022-04-24

The special steam generator for bridge concrete engineering maintenance is Jining Yinghua machinery, professional highway and railway concrete steam curing machine, road and bridge maintenance steam engine, road and Bridge T-beam box girder concrete steam curing machine. The steam generator is widely used in building concrete heating, tunnel steam curing, expressway steam curing, building steam curing Engineering and municipal steam curing engineering, Greening steam maintenance project, water conservancy steam maintenance project.

Bridge maintenance machine is also called steam generator. It is a steam curing equipment for precast bridges, T-beams and concrete components. It ensures that the newly poured concrete hardens in an appropriate temperature and humidity environment within a certain period of time. Effectively prevent the early dry crack of concrete and ensure the later strength and durability of concrete.

Steam curing of bridge cement concrete is the key technology to improve output and ensure quality. According to the conditions of materials, processes and equipment, the guiding ideology for establishing the maintenance system is to reduce the residual deformation and shorten the maintenance cycle as far as possible on the premise of ensuring the demoulding strength. Bridge Road maintainer is a kind of machine that forms high-pressure steam by heating and controlling water to continuously spray concrete pavement for road maintenance. Generally, when the concrete does not have sufficient strength, the premature evaporation of water will also produce large shrinkage deformation and dry shrinkage cracks, which will affect the integrity and durability of the concrete. The concrete curing steam generator plays a vital role in cement mixing, pouring, steam curing and other production links. The steam generator for bridge and road concrete curing can provide appropriate hardening temperature and humidity for concrete hardening, so that the quality of cement products can be strictly controlled. Jining Yinghua concrete curing steam generator has fast gas production speed, shortening steam curing time, accelerating the turnover of cement product modules and improving labor productivity, which is of far-reaching significance to the popularization and application of energy-saving maintenance of construction team.

Application fields: used in bridge building maintenance, bridge road maintenance, railway maintenance, concrete pier column maintenance, concrete maintenance kiln, concrete maintenance pool, heating and humidification maintenance, concrete steam curing, concrete insulation, steam curing room, beam factory steam curing, box girder steam curing and T-beam maintenance.

Features of steam generator products:

It adopts natural magnet all copper floating ball liquid level controller, which is anti-oxidation, regardless of water quality, prolongs the service life by 2 times, recovers waste heat and saves electricity by more than 30%. Safety: electric heating is adopted without open fire to reduce potential safety hazards.

Energy saving: the thermal efficiency is more than 98%, the temperature rises quickly, and it can be used in about 8 minutes.

environment protection

Full automatic electric heating steam generator, full-automatic bridge electric heating steam generator, precast beam maintenance steam engine, bridge maintenance electric heating steam generator, highway bridge concrete maintenance, full-automatic electric steam engine, bridge maintenance, greenhouse steam preheating care steam engine, tunnel secondary lining concrete steam curing.

Steam curing of beam concrete is divided into four stages: static stop, temperature rise, constant temperature and temperature drop. During static stop, the temperature in the shed shall not be lower than 5 ℃, and the static stop time is generally 3-6 hours to prevent cracks and porosity on the component surface, and then start heating up. The heating up temperature should not be too fast to avoid cracks due to excessive temperature difference between the component surface and the interior, The temperature rise rate shall not be greater than 10 ℃ / h, the constant temperature curing temperature in the constant temperature curing stage shall not be greater than 80 ℃ (ordinary portland cement), the relative humidity shall be maintained at 90% ~ 100%, the constant temperature curing time is generally 3 ~ 8h, the concrete temperature in the core of the beam shall not exceed 60 ℃, and the cooling rate shall not be greater than 10 ℃ / h. During steam curing and removal of thermal insulation facilities, the temperature difference between the beam concrete core and the surface, and between the surface and the environment shall not exceed 20 ℃. Steam curing shall be recorded every hour.

Harbin automatic bridge steam curing machine, Changchun 18kw concrete road and Bridge steam curing machine, Yunnan Road and Bridge curing machine, Shenyang precast concrete component steam curing machine, Panjin concrete curing steam engine, Qinhuangdao 36kw bridge curing steam engine, Zhangjiakou special steam generator for concrete engineering maintenance, Baoding beam box steam curing machine, Datong Road and bridge curing steam equipment Shuozhou winter bridge maintenance machine, Taiyuan Luliang bridge maintenance steam generator, Yulin concrete steam maintenance machine, Yan'an 24kw bridge maintenance electric steam engine, Baoji Railway bridge concrete winter maintenance special steam generator, Yinchuan Lanzhou 48kW automatic bridge steam maintenance system, Guiyang concrete component maintenance steam maintenance equipment, Wuwei bridge maintenance steam generator Lanzhou bridge steam curing machine, Chongqing 72kw bridge concrete curing machine, Xi'an box girder curing steam machine, Urumqi 96kw bridge maintenance electric heating steam generator, Sichuan Chengdu prefabricated high-speed railway box girder T-beam steam curing machine.

1、 Scope of application: (bridge, railway) concrete curing

1. Unique internal structure design without boiler use certificate

The water volume of this series of products is less than 30L, which is within the scope of exemption from boiler use certificate, that is, boiler use certificate is not required. The furnace liner is equipped with a built-in steam water separator, which solves the problem of steam with water and ensures the high quality of steam.

2. Adopt high-quality core component - electric heating tube

The electric heating pipe is not only made of high-quality thick wall 316L stainless steel pipe, with a service life of 30% longer than the commonly used 304 stainless steel pipe, but also adopts high-temperature magnesia powder and sealing material, with high temperature resistance up to 170 ℃. The service life of the electric heating tube is better ensured.

3. Adopt high-quality parts

All pipelines, instruments and meters are connected with stainless steel pipes or copper pipes. The electrical appliances are of domestic high-quality brands, safe and reliable use and luxurious configuration.

4. Multiple interlocking safety protection function

The product is equipped with overpressure protection such as safety valve and pressure controller verified by boiler inspection institute to prevent explosion accidents caused by excessive pressure of boiler; At the same time, it has limit low water level protection. When the water supply stops, the boiler will automatically stop working, so as to prevent the damage or even burnout of electric heating elements caused by dry burning of the boiler. The leakage protector ensures the safety of operators and equipment. Even in the case of circuit short circuit and leakage caused by improper boiler operation, the boiler will automatically cut off the circuit to protect operators and control lines in time.

5. Simple installation and convenient use. Finger movement fully automatic

The products pass strict commissioning before leaving the factory. Users only need to connect the power supply and water source, and press the start button to enter the fully automatic operation state of the boiler without complicated installation.

6. Scientific design and exquisite appearance

The cabinet type scientific design style is adopted, the internal design structure is reasonable, and the maintenance is extremely convenient. The boiler shell adopts NC cutting and NC folding one-time forming process, with fine workmanship; The surface of the shell is treated by high-temperature plastic spraying, which is durable and beautiful.

Power 36kw 48kW

Rated evaporation 65L / h 85L / h

Voltage class 380V

Steam temperature 171 ℃

Inner furnace pressure 0.7MPa

Water tank volume 29L

Size 770 * 670 * 1060MM 870 * 730 * 1160mm

Weight 90kg 110kg

1. Material

1. The inner tank and water tank are made of boiler carbon steel, with clean steam and long service life.

2. Energy saving

1. Small volume, pure steam and thermal efficiency of more than 98%.

security

1. If the water tank is short of water, the alarm will be given automatically, and the water pump will stop working automatically to prevent dry operation without water and prolong the service life

2. The water level gauge is equipped with observation light, which is more convenient and fast to observe the water level.

3. The pressure control automatically cuts off the power for heating, and the spring safety valve automatically exhausts when the pressure is too high to ensure safety

convenient

1. The water tank can be filled automatically or manually.

2. Novel, beautiful and generous appearance, small volume and easy to carry

1. Pressure control: when the working pressure reaches the high set pressure, the electric heating pipe will automatically cut off the power and stop heating. The heating indicator is not on; When the working pressure drops to the low set pressure, the electric heating tube will automatically resume heating, and the heating indicator light will be on.

2. Water level control: when the water level of the drum rises to the drunk high water level, the water pump will automatically power off and stop adding water, and the water inlet indicator will not light up. When the water level falls to the drunk low water level, the water pump will automatically power on and add water to the drum, and the water inlet indicator will light up; When the external water supply is cut off or the water pump fault light causes that water cannot be added to the drum, at the same time, the electric heating pipe is powered off to stop heating, and the heating indicator light is not on, at this time, the operator shall stop the boiler in time to find out the cause of the fault until the fault is eliminated.

matters needing attention

1. In order to ensure the personal safety of users, the casing must be firmly grounded before use.

2. It is not allowed to adjust or replace large value safety control insurance and other parts at will.

3. When cleaning the scale and other foreign matters in the furnace liner, when the air pressure in the liner is lower than 0.1MPa, open the bottom blowdown valve to eject the scale and other foreign matters together with steam. Pay attention to safety before opening the blowdown valve. Personnel shall avoid the blowdown outlet to avoid accidents such as scalding.

4. In order to prolong the service life of the machine and prevent excessive dirt accumulation and burning of the electric heating pipe, the machine should use soft water (equipped with soft water equipment) and regularly clean the scale on the surface of the electric heating pipe or liquid level controller.

5. When the power supply voltage is lower than the service voltage, the suction of relay and AC contactor decreases, which may jump continuously and be easy to be damaged. At this time, stop the machine and start it for use after the voltage is normal.




















No related record found

Contact Us

Hello, welcome to Yueqing Chaohuang Electrical Appliances Co., Ltd. Customer service did not reply to you immediately. Please leave your Email address WhatsApp number wechat number  skype  facebook number or other chat number. Customer service will contact you as soon as see it.    

whatsapp +8615058371692 Email cnzhaohang@163.com WEchat +8615058371692  skype +86 15058371692
TEL +8615058371692 
Web site
https://cnzhaonhang1989.en.alibaba.com